Month: April 2025
2025 QRP Schedule
SMRA operates with low power (QRP) in various parks and POTA sites. Here is a listing of the current schedule.
SMRA operates with low power (QRP) in various parks and POTA sites. Here is a listing of the current schedule.
Copyright © 2025 | WordPress Theme by MH Themes